The Bulls Green Pipeline project was for the installation of a 700mm diameter ductile iron pumping main, to run along the centre of a carriageway.
In addition to supplying all site accommodation and welfare units, our scope of works included attendances on under pressure tapings, the pressure testing of the installed pipe and full re-instatement of the carriageway.
![BGP-1](https://hercules-construction.co.uk/wp-content/uploads/2023/08/BGP-1.jpg)
![BGP-2](https://hercules-construction.co.uk/wp-content/uploads/2023/08/BGP-2.jpg)
![BGP-3](https://hercules-construction.co.uk/wp-content/uploads/2023/08/BGP-3.jpg)
See more case studies
Zero Trim Technique - HS2
Through the use of our fleet of state-of-the-art Suction Excavators, we not only avoid one of the most hazardous elements operatives face on highways, rail and utilities projects - Service Strikes - but there are also multiple environmental benefits to this technique, which is fast becoming the industry best standard. […]
N/A
HS2
Suc Ex
![](https://hercules-construction.co.uk/wp-content/uploads/2023/08/image28.jpg)
LOCROS Lift Schemes
The LOCROS Lift Scheme works took place from 2016 to 2019 across three London rail stations; Maryland, Manor Park and Seven Kings. […]
£5,000,000+
Hochtief UK
Rail
![](https://hercules-construction.co.uk/wp-content/uploads/2023/09/44.png)