A fast track project completed within 21 weeks.
The scope included the construction of a new oxidation ditch with 5-metre-high walls and 2 final settlement tank bases 12 metres in
diameter.
The project also included 3 deep excavations (with temporary works) for the installation of RC pumping stations.
A number of site wide pipelines and duct runs were also installed as well as the associated landscaping and footpaths.